Uncategorized

PM Modi inaugurates two novel Mumbai Metro Traces, initiatives in Maharashtra

High Minister Narendra Modi is in Mumbai where he inaugurated two ₹12,600 crores ($1555.7 million) novel Mumbai Metro traces, Metro Line 2A and Line 7, on Thursday. The Mumbai Metro is made up our minds to launch to the general public from 4 pm on 20th January. Except for this, PM Modi additionally launched several initiatives worth around ₹38,800 crore ($4790.7 million) in Maharashtra. The 18.6 km-lengthy Metro Line 2A, usually identified because the Yellow Line, runs between Dahisar East and DN Nagar in Andheri West. From Andheri West to Valani, segment II has been expanded by 9 kilometres, encompassing 8 stations. Furthermore, a distance of roughly 16.5 kilometres between Andheri East with Dahisar East will be linked by Metro Line 7. In maintaining with Mumbai Metropolitan Method Vogue Authority (MMRDA) authorities, the 2 Metro traces would comprise a brand novel interchange speak at Gundavali in Andheri East and Andheri West. Looking out on the time of day, the Metro trains are scheduled to goal on sensible each 10 minutes.

New Mumbai Metro Line to minimize internet site visitors 

The Mumbai Metro New Line is anticipated to carry between three to four lakh passengers day-to-day. It may perchance perhaps in all probability perhaps reduce internet site visitors and crowding, and may perchance perhaps silent additionally carve tear cases by now not lower than 30 to 50 percent. By 2031, it hopes to abet now not lower than 10 lakh day-to-day commuters.

85% Made in India coaches in Mumbai Metro Line 2A, Line 7

The coaches are 85 per cent Made in India by Bharat Earth Movers Exiguous. In maintaining with media experiences, the prepare has a skill of 380 passengers in each coach and can tear at a top bustle of 70 kmph whereas transporting 2,280 passengers. Female passengers will trail in a separate coach, and each cease may perchance maintain a female security guard and CCTV techniques.

Even when drivers will first and main be within the coaches, it’s supposed to be driverless and geared up with a cutting-edge signalling design. PM Modi lay the cornerstone for these traces in 2015. Its 2nd segment, which spans 5.2 km from Goregaon East to Gundavali, will comprise four stations. The Nationwide Basic Mobility Card (Mumbai 1) and the MUMBAI 1 Cell App, both of which may perchance perhaps additionally additionally be veteran to pay for tickets with UPI at Metro speak entrance gates, turned into as soon as additionally launched by the PM.

Designate prices for Mumbai Metro New Line 

The worth of the 2 novel traces’ tickets would be between Rs 10 and Rs 50. The excellent exclaim veteran to calculate effect prices turned into as soon as the passenger’s distance travelled. The fare for a time out of 0–3 kilometres will be Rs 10. The worth is Rs 20 for 3–12 km and Rs 30 for 12–18 km. Additionally, the effect worth turned into as soon as Rs. 40 for 18 to 24 km and Rs. 50 for 24 to 30 km.

Mumbai Metro Route Scheme, Metro Line 2A Timetable

Record of stations on Line 2A contains, Andheri (West), Pahadi Goregaon, Decrease Malad, Malad (West), Eksar, Mandapeshwar, Kandarpada, Better Dahisar and Dahisar (East), Decrease Oshiwara, Oshiwara, Goregaon (West), Valnai, Dahanukarwadi, Kandivali (West), Pahadi Eksar, Borivali (West). This line will intersect metro Line 7 at Dahisar East and Line 6 at Oshiwara. 

Mumbai Metro Line 7 is 16.5 km lengthy and has 13 stations. Record of stations on Line 7- Gundavali, Mogra, Jogeshwari (East), Goregaon (East), Aarey, Dindoshi, Kurar, Akurli, Poisar, Magathane, Devipada, RashtriyaUdyan, and Ovaripada. This line may perchance maintain interchanges at Line 1 in Andheri and Line 2A at Line 6’s JVLR.

WATCH WION LIVE HERE

Content Protection by DMCA.com

Back to top button