BusinessBusiness Line

Beard wins £17m Bristol house of job refurb

Business Article

Beard will add a third floor to 1000 Aztec West and a peculiar envelope

1000 Aztec West will possible be expanded from 38,000 sq ft to 80,000 sq ft by the addition of a third storey and a peculiar exterior envelope.

CEG intends to construct 1000 Aztec West the principle out-of-metropolis house of job development in the southwest that is acquire zero carbon in operation, in accordance with UK Inexperienced Constructing Council (UKGBC) guidelines.

1000 Aztec West, on a industry park seven miles north of Bristol metropolis centre, will possible be powered by renewable vitality, with photovoltaic photo voltaic panels on the roof, vitality ambiance pleasant heating, cooling and lighting fixtures systems, and a manufacture that reduces the amount of vitality the building wants.

Scott Brownrigg is the architect in the encourage of the unusual-survey building. Director Ed Haydon acknowledged: “By remodeling the redundant cloth of the present building we are making a blinding unusual addition to the house of job architecture of Bristol. The utilize of passive manufacture ways and innovative choices ensures that Aztec 1000 addresses the sustainability agenda and could perchance perchance well present a blinding unusual house of enterprise for the next generation.”

Beard Construction starts work this month, with completion expected in summer 2023. The building has already been stripped encourage to the steel to arrange for development.

Matt Cooper, director for Beard in Bristol, acknowledged: “While working with an present structure brings challenges, there are necessary advantages as successfully. By repurposing the present frame at 1000 Aztec West we will place an immense amount of carbon, as the current building is no longer destroyed, and thanks to this fact the vitality of the initial manufacture is no longer wasted.”

Got a fable? Electronic mail [email protected]

Read More

Content Protection by DMCA.com

Back to top button